
|
 |
|
|
|
|
 The 13.5km Route 8 Tsing Yi to Sha Tin section will open in phases in 2008-09, with the Cheung Sha Wan to Sha Tin section to open in March. |
|
|
|
|
|
|
|
Under control: The control room inside the tunnel's administration building is equipped with advanced technologies to ensure smooth traffic.
|
|
|
Go To Top
|
|
|